

For a straightforward single air conditioning system, installation will usually take around 4 to 8 hours, so most jobs can be completed within a day.
More complex installations can take longer, particularly where several indoor units are being fitted, pipework runs are longer, access is difficult or an existing system needs to be removed first.
Before work starts, we’ll explain what is involved and give you a realistic idea of how long the installation is likely to take.
What happens during an air conditioning installation?
- Prepare the work area and confirm the installation plan.
- Fit the indoor and outdoor units.
- Install insulated refrigerant pipework between the units.
- Connect the electrical and control wiring.
- Install condensate drainage.
- Connect the system to the electrical supply.
- Pressure-test the pipework and check for leaks.
- Evacuate the system and prepare the refrigerant circuit.
- Test and commission the system.
- Clean the work area and show the customer how to use the system.
Our engineers will then ensure that the system is working effectively and the customer has been shown how to use the system and that they are satisfied with the completed installation.
The customer will be provided with an information pack including contact details, instructions, features and information about maintenance and warranty.